Videos
- Please use tab to navigate through video controls.
- Upon entering the player press space bar to reach the play button
Present Day Flood Risk
Flood risk for a 0.5% Annual Exceedance Probability (1 in 200 year event) with current defences in place
Present Day Flood Risk
Flood risk for a 0.5% Annual Exceedance Probability (1 in 200 year event) with current defences in place
Do nothing baseline in 2075
Shows the flood risk that would occur in the year 2075 assuming no further maintenance has been undertaken over time and defences have failed. This is for a 0.5% Annual Exceedance Probability (1 in 200 year event)
Strategy area in 2046
Shows the Strategy area in 2046. It assumes that most of the Strategy proposals are in place (Keyhaven (West & Central), Avon Water, Keyhaven East to Fishtail, Jetty-Butts & Oxey-Pennington and Normandy to Salterns). This is for a 0.5% Annual Exceedance Probability event (1 in 200 year event).
Strategy area in 2075
Shows the Strategy area in 2075, this assumes that all the Strategy proposals are in place. This is for a 0.5% Annual Exceedance Probability event (1 in 200 year event).
Hurst Spit to Lymington Draft Strategy Webinar - 8 July 2026
Hear from members of the Strategy Team on the following;
Strategy Introduction
Rhian Edwards, Senior Flood Risk Advisor, Environment Agency
Overview of the Draft Strategy Proposals
Alec Dane, Technical Director, JBA Consulting
3D Visualisations
Cara Brims, Senior Project Manager, JBA Consulting
Programme Overview, Next Steps & Engagement
Rhian Edwards, Senior Flood Risk Advisor, Environment Agency
Followed by Q&A from participants